The shell of metering distribution box is made of high-quality cold-rolled steel plate, and the door of the box is provided with an observation hole;
For single-phase meter box and three-phase meter box without switch, the cable directly enters and connects to the wiring bus bar, and the user of each unit directly goes from the watt hour meter. For the single-phase meter box with single-phase switch, the cable is connected to the wiring bus bar, and connects from the outlet end of the switch to the unit user, and the lead seal wire is used after the installation and commissioning;
Cable inlet and outlet from the top or bottom are available. The switch room is equipped with three-phase wiring bus bar and protective grounding bus bar, which is convenient to realize single-phase two-wire, single-phase three-wire, three-phase four-wire and three-phase five-wire power supply. The box is equipped with lead sealing screws, and the line partition can be made according to the customer's requirements to separate the switch from the meter.
| 余干县| 丰原市| 理塘县| 双桥区| 吉隆县| 汉阴县| 浦东新区| 攀枝花市| 江城| 蒲城县| 滦平县| 上思县| 星子县| 扎兰屯市| 红桥区| 宜川县| 三门县| 葫芦岛市| 廉江市| 武威市| 沙坪坝区| 遂川县| 德保县| 安图县| 新昌县| 清水河县| 定日县| 平陆县| 望奎县| 普兰店市| 攀枝花市| 磴口县| 五台县| 康马县| 钟山县| 沅陵县| 图们市| 栾城县| 白银市| 九龙城区|